There are three principal methods of conveying a new ship from building site to water, only two of which are called "launching." The oldest, most familiar, and most widely used is the end-on launch, in which the vessel slides, usually stern first, down an inclined slipway. The side launch, whereby the ship enters the water broadside, came into 19th-century use on inland waters, rivers, and lakes, and was more widely adopted during World War II. The third method is float-out, used for ships that are built in basins or dry docks and then floated by admitting water into the dock.